Aquatic Sport Centres

PROJECT DESCRIPTION

For 2013 Sea Game, we had built Wunna Theikdi and Zeyar Thiri Aquatic Sport Center, finished in May 2013, with same floor area of 108,056 ft2. During the methodical construction process, analysis of the roof's steel frame and the stresses placed on the trusses involved our Structural Analysis, simulation system and other computer analysis. We performed our best for the whole project including design, planning, establishing, landscaping works, M&E works and so on.

PROJECT DETAILS

Categories:
Venue: Naypyitaw
Total Floor Area: 108,056 ft² (10,042.35 m² ) each
Owner: Ministry of Sports
Project Duration: April 2011 to May 2013
Type of Building: R.C Building with Steel Structure Roofing
Seating Capacity: 2,456 nos
Dimension : Competition Pool (51x25x3m)
Diving Pool (26x25x5m)
Warm up Pool (50x25mx3m)
Technology: Myrtha technology